170 hectares of our own nursery
More than 55 years of experience
Environmental awareness
Working effectively with unique specialist machines

Our working method

The process from advice to realisation for this expertise

1. Quotation request

You make your request by telephone or via our website and provide us with as much information as possible. On this basis, we will discuss the possible next steps.

2. Price calculation

Once we have sufficient data, we will get to work on a non-binding indicative quotation.

3. On-site visit

Does our proposal fit in with your plans? Then we make an appointment on location to view the situation and discuss our proposal. Completely free of charge.

4. Final offer

We incorporate your additional wishes and our findings into the quotation. After signing, we plan the installation.

5. Getting started

We carry out the work in the agreed week.

Request a quotation or free advice?

Improved quality of the zinc casting

On a floating platform, the zinc structure is constructed directly on the water, close to the location where it will ultimately be sunk. As a result, it hardly needs to be towed after production. This reduces the risk of deformation, displacement and unwanted overlaps within the laying plan.

As the gabion retains its shape better, it can be positioned and sunk with greater precision. This requires experience, craftsmanship and close coordination between production on the barge and installation on the water. The result is a flat and uniform sinker that reliably protects the seabed and banks against erosion.

With a traditional ‘zate’, large fascine mattresses are often first dragged over a considerable distance to their final location. Using a ‘zathe’ significantly shortens this step. This reduces the number of transport movements, minimises the risk of damage and ensures a more efficient sinking process.

floating-screen-content
drijvende-zate-werkruimte-ontbreekt

Working where there is a lack of space on the bank

In inner-city areas, ports and industrial estates, the space available along the water’s edge is often limited. A traditional loading bay requires a spacious and easily accessible working area for lorries, cranes and material storage, amongst other things. At many project sites, such space is either unavailable or its use causes additional disruption to the surrounding area.

Using a floating platform, Van Aalsburg moves the bulk of the work onto the water. This keeps the quay more accessible, reduces the impact on roads and public spaces, and minimises the space required for temporary works facilities. This makes this approach particularly suitable for complex sites where accessibility, safety and meticulous execution are key considerations.

floating-screen-specialist

Specialist in floating screens

Van Aalsburg B.V. is one of the few specialist hydraulic engineering companies that carries out the entire process of constructing a floating weir entirely in-house. Over the past few decades, we have systematically applied this method to an average of two to five projects per year, both in the Netherlands and abroad.

Our skilled professionals have extensive experience in designing, constructing and deploying large pontoon structures on which work can be carried out safely and efficiently. Where the project requires it, an electric crane can also be used on the barge. In this way, we minimise direct emissions and combine natural materials with a sustainable solution on the water.

Suitable for heavy-duty bentonite mats

Bentonite mats combined with willow stakes form a heavy-duty soil protection structure. Due to their high weight per square metre, these mats are difficult to handle from a traditional barge. A floating barge therefore provides the space and stability required to carefully assemble the structure and lower it into the water in a controlled manner.

Van Aalsburg has extensive practical experience in the manufacture and handling of these heavy mats on coupled pontoons. Our skilled professionals carefully coordinate the construction, logistics and execution. This ensures that bentonite mats with weirs can be installed safely, efficiently and to a high standard in the correct location.

floating-screen-bentonite-mats
van-aalsburg-team photo

ISO 9001 | ISO 140001 | VCA** | Co2 Performance Ladder | FSC Certificate® | NAK Tuinbouw 72432

3rd generation family business

Special willow timber trade, in which the craft has been passed on from father to son(s). Grown into a large and dynamic family business with six brothers. Go-getters. An international company that breathes one big family in everything. With around eighty motivated specialists.

  • 170 hectares of our own produce
    and over 55 years’ experience
  • Working effectively
    with unique specialist machinery
  • Environmentally responsible business practices
    Sustainability is a top priority for us

Frequently asked questions

What is a floating sluice?

A floating platform is a large working platform consisting of linked pontoons on which caissons are constructed directly on the water. This allows work to be carried out close to the final sinking location.

When is a floating sluice the best solution?

A floating barge is particularly suitable for locations where there is limited space along the bank, such as inner-city areas, harbours and industrial estates. This method also offers clear advantages when dealing with large or heavy sink pieces.

What are the benefits for the quality of the zinc casting?

As the zinc piece hardly needs to be moved after production, it retains its shape better. This reduces the risk of deformation, displacement and unwanted overlap, and enables more accurate galvanising.

What is the difference between a floating zate and a traditional zate?

A traditional zate is situated along the riverbank, whereas a floating zate consists of pontoons and is situated on the water. This allows work to be carried out closer to the sinking site and requires less workspace on the bank.